video

Beam Formwork

Introduce of beam Formwork beam formwork is a formwork system that helps concrete take shape. It is assembled into a mold of a specific shape so that the concrete can be formed into the required geometric shape and size after pouring. Steel formwork usually consists of steel panels, support systems, connectors and adjustment devices, and has the characteristics of high strength, high precision and high reuse rate. Steel formwork is often used in commercial buildings, bridges, dams, and skyscrapers. Types of Steel Formwork A. According to the purpose of beam formwork, it can be divided into: civil construction (house construction) steel formwork and bridge steel formwork. B.According to the pouring shape of the beam formwork, it can be divided into: box girder formwork, T-beam formwork, cover beam formwork, hollow beam formwork, round formwork, protective beam formwork, pier column head formwork, etc. C.There is also a combined beam formwork which is divided into: large formwork, small formwork, medium formwork, internal corner, external corner and so on.

  • Product Introduction

Characteristic

1.More Quickly
- Quickly erection and dismantlement rate up to 100 m2 slab formwork per person every day.
- Efficient solutions for infill zones, beams, shear wall and dropping slab area.
- Minimal need for craneage during set-up and transfer.

2.More Safety
- High strength ability panel.
- Self lock clamp
- Pre-designed panel layout ensures every panel is put up correctly.

3.More Simplicity

44796a82-bd0f-4ef8-a96e-99e3cbfeea06

Packaging:

1. Generally, the beam formwork total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading.

2. Different beam formwork packages are used for different products:
---Bundles: Timber beam, steel props, tie rod, etc.
---Pallet: Small parts will be put in bags and then on pallets.
---Wooden cases: It is available on customer's request.
---Bulk: Some irregular goods will be loaded in bulk in container.

Delivery:

1. Production: For full container beam formwork, normally we need 20-30 days after receive customer's down payment.

2. Transportation: It depends on the destination charge port.

3. Negotiation is needed for special requirements.

 

 

 

 

- Only hammer be required in operation.
- Manual erection and movement, minimal crane required
- Simple infill component is needed to fill the gap zone
- Easy to train and work with
- Multipurpose accessories

4.Hand-held design
Largest size panel 1800 x 1200mm only 44kg.

5.Only Panel & Prop
- No deck beam design, easy to be managed, storage, repair and seach.
- Minimal prop and panel numbers, more clean, more wide working space.
- Speed working: quickly erection and dismantle, time-saving infill solution for joint wall & column, drop area, beam and cantilever solution.

6.Much less cran-time be needed
Working can move ahead rapidly, independently and without interruption even when the crane is fully occupied. The crane is no longer a 'chorke point' duiing formwork setup.

7.Standardized panel for various structure building
All formwork component can be reusable on different project

Hot Tags: beam formwork, China beam formwork manufacturers, suppliers, factory, formwork contractors, Formwork Plywood 18mm, foundation formwork, formwork system, High strength Steel Formwork, formwork

Send Inquiry

(0/10)

clearall